Skip to content
PETRALISEnergy Resources

Projects & Track Record

An East Texas platform, with a wider development brief.

Historical operating experience and the current East Texas platform are stated separately. Current figures are as of the date shown and are not mixed into the historical record.

Historical track record

Experience behind the platform

Wells operated historically
121+
Acres managed through the platform’s history
45,000
Acquisitions
Seven
Drilling experience
Vertical and horizontal
Workovers and well interventions
100+
Facilities
Major gas-processing projects

Current operated platform

East Texas today

As of June 2025

Operated wells
41
Producing wells
31
Net mineral acres
8,425
Gross oil
98 BOPD
Gross gas
4.46 MMCFD
Net oil
44 BOPD
Net gas
2.1 MMSCFD

East Texas

Acquire, restore, optimize, and drill selectively.

Since 2019, Petralis has completed seven acquisitions with a total transaction value of $10.5 million, building the current East Texas operating platform.

Drilling on that platform includes one vertical Pettit well and one 4,250-foot horizontal Cotton Valley well. Workovers, recompletions, and artificial lift remain central to how producing wells are restored and kept online.

Petralis no longer operates Gladewater Field or the Paluxy Jesse Owens Field.

  • Operated base

    Tennessee Colony Oil

    Part of the current operated East Texas platform.

  • Operated base

    Naconiche Creek

    Part of the current East Texas platform.

  • Operated base

    Tennessee Colony Gas Deep

    Part of the operated footprint that anchors current production and acreage.

  • Prospect

    Pecan Gap, Leon County

    A separate shallow oil project in Leon County, with vertical and horizontal redevelopment, distinct from the operated producing base.

International development

Brownfield redevelopment with local execution.

International work is concentrated on mature resources and existing infrastructure paired with a local operating partner. The active partnership is with Grupo Consomka C.A. in Venezuela.

Project participation is subject to definitive agreements, applicable law, and required regulatory approvals. Petralis does not describe a prospect as an operated project until that basis is in place.

Strategic infrastructure

Owner-side delivery of gas processing and field systems.

Representative facilities experience includes owner-side engineering, procurement, construction coordination, commissioning, and operating integration.

25 MMSCFD
NGL processing facility
~200 bbl/d
Liquids capacity
50 MMSCFD
Dehydration and compression

Carbon management and Class VI

Subsurface projects beyond conventional production.

Carbon storage and Class VI project management sit inside Petralis’s technology and special-projects capability, alongside reservoir analysis, regulatory coordination, and technical-commercial screening. Specific permits, injection volumes, and project names are published only when they are approved for release.

Contact

Discuss a strategic partnership.

Petralis welcomes conversations with operating partners, institutions, and counterparties evaluating complex energy development.